1. INITIALIZATION
NOTICE:
HINT: Initialization cannot be completed by only removing the battery.
2. FOR USING INTELLIGENT TESTER
CAUTION: Observe the following items for safety reasons:
3. FOR USING BATTERY DURING INSPECTION
4. COOLING FAN SYSTEM
NOTICE:
HINT: If all of the following are met for a certain period of time during a few minute period immediately before the engine is stopped, the electric fans will continue to operate for 3 minutes after the engine is stopped. This is performed to ensure restartability and stabilize idle speed.
The following sensors are used for this control:
Installation
1. INSTALL SHIFT LEVER ASSEMBLY
(a) Install shift lever assembly to the vehicle with the 4
bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
NOTICE:
Into datum hole of shift lever into datum pin of
instrument lower.
(b) Connect the 2 connectors to the shift lever
assembly.
...
Inspection
1. INSPECT PURGE VSV
(a) Measure the resistance of the purge VSV.
Standard resistance
If the result is not as specified, replace the purge
VSV.
(b) Check the operation of the purge VSV.
(1) Check that air does not flow from port E to port
F.
(2) Apply battery voltage across t ...
Reclining Motor Circuit
DESCRIPTION
The fold seat control ECU receives a switch operation signal from the power
rear no. 2 seat switch and
the fold seat switch, and activates the reclining motor. At this time, the Hall
IC (seatback position sensor)
detects the actuation of the seatback and sends a seatback actuation ...